ul. Chabrowa 4, 52-200 Wysoka

Warehouse Area: 36,700 m²
Office Space: 3,000 m²
Execution Period: January 2021 – July 2021
Challenge: Fabric diffusers.

Design of water and sewage installations, central heating with a gas boiler room, mechanical ventilation, and VRF air conditioning.

Design of water and sewage installations, heating systems, including central heating and process heat, mechanical ventilation, internal gas installation, air conditioning, compressed air systems, and vacuum roof drainage for the production and warehouse hall, as well as for the office and restroom blocks within it.

Execution of Installations: