ul. Chabrowa 4, 52-200 Wysoka

Warehouse Area: 2,000 m²
Execution Period: April 2023 – June 2023
Challenge: Maintaining temperature and humidity within a constant range according to GIF requirements.

The installation consists of a ducted circulating air conditioning system with year-round temperature and humidity regulation, based on VRF system ducted air conditioning units. External units located on the roof of the hall serve as the source of heat and cooling, working in conjunction with the ducted indoor units.

The cooling installation is a two-pipe system, and a condensate drainage system is provided for the units. Air distribution is achieved through diffusers equipped with actuators that automatically adjust the position of the blades depending on the season—operating in either heating or cooling mode. Additionally, there is compensatory mechanical ventilation at the ventilation unit.